Resources search results "investments"

Training Pays: Actual vs. Projected Start-Up Results
PERFORMANCE ASSOCIATES INTERNATIONAL
Developing a profitable mining venture is no small matter. It requires enormous initial investments in research, construction, and equipment. But a mineral processing plant does not run itself. Even with the best equipment and good ore quality, optimal results are dependent upon keeping the process running smoothly, avoiding process upsets, maintaining process variables in the desired range, and minimizing breakdowns and downtime. A highly trained workforce is an essential element in a successful, and profitable, start-up. The knowledge and abilities of plant operators and maintenance personnel can make or break an operation. Trained operators know what to look for during preoperational and routine inspections, allowing maintenance tasks to be planned and unexpected costly breakdowns avoided. Trained operators know what variables exist at different stages in the process and how to make appropriate adjustments in real time. Trained maintenance personnel are well acquainted with the plant equipment, and maintenance planners can schedule work and maintain a spare parts inventory to minimize downtime. Additionally, new operations that train their workforce just prior to plant commissioning can utilize their operators in the commissioning process. Having been trained and gained field experience through plant commissioning, operators are ready to hit the ground running once feed is introduced. A faster ramp-up means more earnings, more quickly. The cost of developing a proper training program is a small percentage of the overall engineering, procurement, and construction budget but it constitutes a large percentage of the gains realized from a successful start-up and ramp-up to full production. Performance Associates International (PAI) has designed and presented custom training programs for operators and maintenance personnel in metallurgical plants around the world for over 35 years. We are proud to have been part of the successful start-ups at Lundin Mining’s Eagle Mine, Vale’s Voisey’s Bay project, and Torex Gold’s El Limon-Guajes project. Click Download to view the actual vs. projected start-up results from these three metallurgical plants that made use of PAI’s custom-built training programs and on-site training.
Interested in BIG Productivity Gains? Wipe Out Non-Productive Driver and Fleet Time
Command Alkon
There’s some good, solid news for the construction industry: Dodge Data & Analytics Index projects that we’ll have “moderate strengthening” through the end of 2018. But in terms of productivity, we appear to be heading in a different direction. Of note, a recent survey of 600 global construction leaders* compiled by PlanGrid and FMI Corporation mentions: ·         Poor communication, rework and bad data management cost the construction industry; $177 billion annually in labor costs in the United States alone. ·         Construction workers lose almost two full working days per week solving avoidable issues and searching for project information. ·         Each construction project team member spends more than 14 hours weekly on average dealing with conflict, rework and other issues. ·         Almost half of all rework is due to poor communication among project stakeholders, and poor project information, while 26% of rework is due to poor communication or miscommunication between team members caused unresponsiveness of team members; the inability of project stakeholders to collaborate effectively; and the lack of a common platform for all team members to communicate and share project data. ·         The most common goals for technology adoption included providing better access to project data, improving project productivity and increasing the accuracy of project information. ·         Workers are not taking full advantage of mobile devices and IT investments. Stamp Out Non-Productive Driver and Fleet Time for Big Productivity Gains It stands to reason that companies who address productivity issues will not only avoid scrambling for information and wasted hours and energy but also quickly gain competitive advantage. If you’re managing drivers and trucks that wheel in and out of numerous sites during the day or week and aren’t using automatic processes via technology to more efficiently track and manage your fleet, there’s more good news. You can increase driver productivity and avoid the 20-40 minutes per truck per day that’s lost through clocking in and out and other non-productive activities during: ·         Time in Transit ·         Time at the Job Site ·         Time in the Yard Forty minutes per day, per truck may seem marginal at first glance. But 200 minutes/week x 48 weeks/ year = 9,600 minutes, 160 hours or a total of 4,000 hours of inefficiency for a fleet of 25 trucks. Time in the yard is the lever most within a producer’s control and represents over half of the total nonproductive time per truck. So, rather than simply adding incremental trucks and drivers to the fleet to boost productivity (which unfortunately only adds to the total non‐productive hours and fails to improve operational processes), consider a solution that: ·         Uses automatic processes via technology to more efficiently track and manage your fleet. ·         Enables your drivers to punch the clock from in the cab, an efficiency enhancer that alone could save you up to 20 minutes per day (this is time spent in your own yard, under your own watch, that you can act on quickly to recapture those minutes, regardless of what happens away from your yard). ·         Captures a meaningful portion of that lost time from each driver. ·         Provides a constant view into the location and performance of your entire fleet. ·         Is adaptable and helps your teams collaborate in real-time with a “central source of truth” and access to relevant data when you need it. At least 50% of employees’ non‐productive time can be captured back efficiently and effectively when the right combinations of levers are pulled – both in terms of area of focus (i.e., time in yard) and adaptability to each individual customer’s business process requirements. This equates to big productivity increases over both the short- and long-term. Learn more about how Command Alkon’s TrackIt solution offers an industry specific, flexible and fully customizable solution to track your fleet and meet your specific needs, including in-cab time and attendance functionality focused at recapturing lost time in the yard, helping you drive a more efficient fleet and improve your profitability. *500 respondents from the United States and 99 from Australia, New Zealand, United Kingdom and Canada. Of those surveyed, 49% work for general contractor firms, 36% came from specialty trades and 15% were owners. Over 300 respondents came from the commercial sector and the other respondents represent industrial and manufacturing, heavy civil, healthcare, power (oil and gas, and energy), education and government.
Interested in BIG Productivity Gains? Wipe Out Non-Productive Driver and Fleet Time
Command Alkon
There’s some good, solid news for the construction industry: Dodge Data & Analytics Index projects that we’ll have “moderate strengthening” through the end of 2018. But in terms of productivity, we appear to be heading in a different direction. Of note, a recent survey of 600 global construction leaders* compiled by PlanGrid and FMI Corporation mentions: ·        •Poor communication, rework and bad data management cost the construction industry; $177 billion annually in labor costs in the United States alone.        •Construction workers lose almost two full working days per week solving avoidable issues and searching for project information. ·       • Each construction project team member spends more than 14 hours weekly on average dealing with conflict, rework and other issues. ·         •Almost half of all rework is due to poor communication among project stakeholders, and poor project information, while 26% of rework is due to poor communication or miscommunication between team members caused unresponsiveness of team members; the inability of project stakeholders to collaborate effectively; and the lack of a common platform for all team members to communicate and share project data. ·        •The most common goals for technology adoption included providing better access to project data, improving project productivity and increasing the accuracy of project information. ·        •Workers are not taking full advantage of mobile devices and IT investments.      Stamp Out Non-Productive Driver and Fleet Time for Big Productivity Gains It stands to reason that companies who address productivity issues will not only avoid scrambling for information and wasted hours and energy but also quickly gain competitive advantage. If you’re managing drivers and trucks that wheel in and out of numerous sites during the day or week and aren’t using automatic processes via technology to more efficiently track and manage your fleet, there’s more good news. You can increase driver productivity and avoid the 20-40 minutes per truck per day that’s lost through clocking in and out and other non-productive activities during: ·         •Time in Transit ·         •Time at the Job Site ·         •Time in the Yard Forty minutes per day, per truck may seem marginal at first glance. But 200 minutes/week x 48 weeks/ year = 9,600 minutes, 160 hours or a total of 4,000 hours of inefficiency for a fleet of 25 trucks. Time in the yard is the lever most within a producer’s control and represents over half of the total nonproductive time per truck. So, rather than simply adding incremental trucks and drivers to the fleet to boost productivity (which unfortunately only adds to the total non‐productive hours and fails to improve operational processes), consider a solution that: ·         •Uses automatic processes via technology to more efficiently track and manage your fleet. ·         •Enables your drivers to punch the clock from in the cab, an efficiency enhancer that alone could save you up to 20 minutes per day (this is time spent in your own yard, under your own watch, that you can act on quickly to recapture those minutes, regardless of what happens away from your yard). ·         •Captures a meaningful portion of that lost time from each driver. ·         •Provides a constant view into the location and performance of your entire fleet. ·        •Is adaptable and helps your teams collaborate in real-time with a “central source of truth” and access to relevant data when you need it. At least 50% of employees’ non‐productive time can be captured back efficiently and effectively when the right combinations of levers are pulled – both in terms of area of focus (i.e., time in yard) and adaptability to each individual customer’s business process requirements. This equates to big productivity increases over both the short- and long-term. Learn more about how Command Alkon’s TrackIt solution offers an industry specific, flexible and fully customizable solution to track your fleet and meet your specific needs, including in-cab time and attendance functionality focused at recapturing lost time in the yard, helping you drive a more efficient fleet and improve your profitability. *500 respondents from the United States and 99 from Australia, New Zealand, United Kingdom and Canada. Of those surveyed, 49% work for general contractor firms, 36% came from specialty trades and 15% were owners. Over 300 respondents came from the commercial sector and the other respondents represent industrial and manufacturing, heavy civil, healthcare, power (oil and gas, and energy), education and government.
Mine on Demand
MMI
Productivity has become the new mantra in recent years for the mining industry. Ever since the “super cycle” of the commodities price boom came to an end, industry executives have realized that a blind chase for value can lead to significant structural costs and productivity defects in the mining process, which ultimately decrease profit. Many chief executive officers (CEOs) have responded to this market volatility by making significant cuts in capital investments. Possessing more operational (“back to basics”) profiles than their predecessors, industry leads now realize that in addition to improving short-term cash flows, they need to: ●● Make sustainable gains in productivity. Programs aimed at improving productivity need to have an enterprise-wide impact, beyond pilot programs that address people or equipment. These productivity initiatives also need to be accepted across all operations and made sustainable going forward by emphasizing truly continuous improvements. ●● Respond with more agility to fluctuating market demands. Business agility requires a supply chain design that enables faster responses to shifts in market demands and prices. With improved business agility, it’s possible to optimize net results per quarter—right down to margin-per-hour operations. Transforming the supply chain design in this way requires a forward-looking understanding of market demand, scenariobased planning, optimal resource allocation and flexible scheduling decisions—all of which necessitate changes across people, technology and processes.