The Construction Industry is Lagging in Digitization - Let's Get Unstuck
The Construction Industry is Lagging in Digitization - Let's Get Unstuck
Description
What exactly is a "digital transformation?"

Related Resources

Part 4 - Information Systems and Maintenance Work Control
PAUL D TOMLINGSON
Part 4 – Information Systems and Maintenance Work Control - Parts 1, 2 and 3 of this series established that many existing fully-integrated information systems do not provide adequate support of supervisor’s maintenance work control needs. Work order elements are too complex and time consuming for use in the ‘pressure-cooker’ working environment of maintenance supervisors. As a result many supervisors are using ineffective work control procedures that neither control work nor provide field data for required information. In turn, maintenance planners are compelled to prepare ‘official’ work order documents to capture missing data. Many planners are simply ‘work order administrators’ with no time left to plan. When management requires information, these planners may be ‘creating’ bogus information misleading management decision-makers. Since not all work requires planning, a simpler work order element for supervisors can meet their work control needs and also allow them to control all non-planned work. Information system problems are acknowledged by system developers but without being corrected. However, many maintenance organizations have contributed by not developing a well-defined maintenance programs and specifying their information needs. Instead, they have accepted and tried to use the generic information output of overly complex package systems. This ‘log jam’ requires corrective actions. An outstanding PC-based system that satisfies the supervisors work control requirements, returns planners to their full time planning tasks and creates essential information has been identified. The system developer’s introductory presentation was obtained and is attached.
Gold Mill Grinding—Example of a Detailed eLearning Operator Training Module
PERFORMANCE ASSOCIATES INTERNATIONAL
This video provides an example of the content and structure of a Performance Associates International computer-based operator training program. In this video, we focus on the user experience of our eLearning module for operators in a gold mill grinding circuit. This example demonstrates the following program features: • Language toggle controls. • Interactive process flowsheets. • Process descriptions. • Principles of operation. • Workbook feature. • Equipment (SAG mill) 3D animation. • Process variables. • Control loops. • Interlocks. • Alarms. • Interactive plot plan. The grinding circuit is just one of 11 modules included in the complete plant operator training program. Each individual module covers the technical aspects of a specific plant area. The program also contains modules presenting basic introductions to many applicable unit operations and a variety of basic mechanical skills. Additionally, detailed maintenance training modules cover each significant piece of equipment in the plant. A comprehensive training component to develop supervisory skills is included as well. Building, running, and maintaining a new plant is a significant investment. A work-force well-trained from top to bottom is the best way to protect that investment by ensuring a successful start-up and continued operations at peak performance. If you are building a plant and preparing your operators and supervisors for start-up and operation, please stop and ask the question “what components of this training program do I NOT want my operations team to be thoroughly familiar with?”
Performance Associates International (PAI) y Torex Gold colaboran para una puesta en marcha exitosa
PERFORMANCE ASSOCIATES INTERNATIONAL
Con demasiada frecuencia, las compañías de recursos naturales ponen en marcha plantas nuevas sin contar con un equipo de operaciones y mantenimiento debidamente capacitado. El resultado puede ser desastroso tanto en términos de seguridad como de ingresos. Obviamente el objetivo fundamental es una planta que funciona de forma segura y rentable. En la mayoría de los casos, la capacitación sobre seguridad que se da antes del arranque de la planta es satisfactoria, resultando en pocos accidentes (o ninguno) durante la puesta en marcha y operaciones subsecuentes. Sin embargo, muchas plantas son negligentes cuando se trata de la buena capacitación de su personal de operaciones y mantenimiento. Un programa de capacitación bien ejecutado compensa con creces los costos de ejecución del mismo. Si se va a presupuestar una ingeniería de alta calidad, un proceso de adquisición eficiente y una gestión de construcción experimentada y comprobada (incluyendo el comisionamiento), ¿por qué dejar a la suerte la capacitación? Performance Associates International (PAI) desarrolló un programa de capacitación por computadora comprensivo, el cual abarca operaciones y mantenimiento, para su planta de oro El Limón-Guajes en el estado de Guerrero, México. En el 2015, los especialistas de capacitación industrial de PAI viajaron al lugar del proyecto para entrenar a los empleados de Torex Gold en anticipación de la puesta de marcha de la planta y la producción de oro. El emprendimiento fue un “éxito masivo,” según Nelson Bodnarchuk, Director, Sistemas Operacionales. Este video cuenta la historia de ese éxito, incluyendo comentarios generosos de los oficiales ejecutivos de Torex, quienes reconocen nuestro papel en la colaboración.
Is Your Jobsite a Wasteland? Check Out These 3.5 Ways to Reduce Waste and Costs
Command Alkon
No, I’m not talking about piles of leftover debris or even the kind of “trashy” look that’s common on construction sites. While neatness is nice, especially on a highly visible site, the waste I’m referring to is all those insidious, sometimes hidden, wastes that may not look messy but can make a real mess of budget forecasts and construction schedules.Jobsite waste – and the losses it creates – is a serious problem throughout the HBM industry. In fact, according to a 2016 McKinsey study, “Large projects across asset classes typically take 20 percent longer to finish than scheduled and are up to 80 percent over budget.”Most budget overruns are not the result of leftovers or throwaways. Most are a result of squandering 1) time, 2) motion, and/or 3) accuracy. Eliminating waste is an ongoing challenge, but these best practices can help you recognize – and correct – this resource-draining scourge:1) TIME. Wasting time is probably the most common and costly jobsite activity, especially since it’s virtually always unintentional and unobtrusive. What’s the best way to spot it? Recognize that all wait time is wasted time. Any person, place or thing that sits idle or is not ready when needed is generating waste.When workers wait on instructions or tools or equipment or approval or inspection, their time is being wasted. When tools, parts or equipment are unavailable or inoperable, time is being wasted. When one process or procedure is stalled waiting for another to be completed, valuable time is being wasted.Wasted time typically results from inadequate planning, communication or resource allocation, so invest in these time-saving, preventive measures instead:·         Begin with informed planning that includes all pertinent people. Early integration and transparent information sharing improve efficiency at every operational stage.·         Forecast construction schedules, budgets and requirements so that you can realistically anticipate tools, materials and labor.·         Create and communicate contingency plans so that the entire crew stays up to date and in sync.·         Use technology to communicate.  Radios, mobile phones, tablets and other digital tools speed communication and improve clarity.2) MOTION. Going back to the truck to grab another tool, hunting down a colleague for collaboration, moving critical materials or machinery from its current location to where it’s needed, dispatching and transporting workers, even unloading deliveries and distributing parts are all costly operations that reduce productivity. Any unnecessary or unplanned movement of people, equipment, tools or materials wastes valuable time and energy.To minimize wasted motion, use efficient workplace procedures and productivity-enhancing devices:·         Plan ahead to place and prepare critical equipment for use at the point of operation.·         Corral required tools, parts, kits and equipment in well-stocked, well-organized, well-maintained work carts. ·         Equip workers with tool belts, trays, bins and pouches for easy accessibility.·         Use rail-lock aerial accessories (tool bins, pipe racks, cradles, panel carriers, etc.) when working on scissor lifts, boom lifts or other platforms for safe, secure, fast access.·         Use communications technology to locate misplaced or misappropriated resources. ·         Designate a worker to make deliveries and tools runs as needed.3) ACCURACY. Precision in quality control, inventory management, and maintenance and replacement programs is vital for preventing wasted materials and labor. Symptoms of sloppy jobsite practices include tasks that can’t be done due to damaged, defective or missing materials; rework due to poor quality or specification mismatches; “shrink” due to lost or stolen tools or inventory; breakage due to careless handling or improper use; and mistakes in ordering, stocking, storing, handling and accounting for materials.Verifying resources and quality takes attention and vigilance. These common-sense practices can bring valuable order and discipline to your jobsite: ·         Make sure all workers have a clear project understanding, including the latest drawings, specifications and contingency plans.·         Lock up tools and equipment at days’ end and when not in use.·         Remove and replace damaged tools or materials immediately.·         Designate a specific person to order, inspect, label and monitor materials, especially near job’s end, to avoid leftover inventory.Are time and resources going to waste on your jobsite? Command Alkon helps make fast work of unnecessary jobsite losses. To reduce the costs, risks, and waste that result from out-of-stock and over-stock situations, inefficient hauling practices, and lack of transparency, the HBM industry relies on Command Alkon’s supplyCONNECT to manage daily replenishment plans. By promoting collaboration among supply chain trading partners, supplyCONNECT saves money and time – ensuring that the right amount of inventory is delivered to the right place at the right time. 
Interested in BIG Productivity Gains? Wipe Out Non-Productive Driver and Fleet Time
Command Alkon
There’s some good, solid news for the construction industry: Dodge Data & Analytics Index projects that we’ll have “moderate strengthening” through the end of 2018. But in terms of productivity, we appear to be heading in a different direction. Of note, a recent survey of 600 global construction leaders* compiled by PlanGrid and FMI Corporation mentions: ·        •Poor communication, rework and bad data management cost the construction industry; $177 billion annually in labor costs in the United States alone.        •Construction workers lose almost two full working days per week solving avoidable issues and searching for project information. ·       • Each construction project team member spends more than 14 hours weekly on average dealing with conflict, rework and other issues. ·         •Almost half of all rework is due to poor communication among project stakeholders, and poor project information, while 26% of rework is due to poor communication or miscommunication between team members caused unresponsiveness of team members; the inability of project stakeholders to collaborate effectively; and the lack of a common platform for all team members to communicate and share project data. ·        •The most common goals for technology adoption included providing better access to project data, improving project productivity and increasing the accuracy of project information. ·        •Workers are not taking full advantage of mobile devices and IT investments.      Stamp Out Non-Productive Driver and Fleet Time for Big Productivity Gains It stands to reason that companies who address productivity issues will not only avoid scrambling for information and wasted hours and energy but also quickly gain competitive advantage. If you’re managing drivers and trucks that wheel in and out of numerous sites during the day or week and aren’t using automatic processes via technology to more efficiently track and manage your fleet, there’s more good news. You can increase driver productivity and avoid the 20-40 minutes per truck per day that’s lost through clocking in and out and other non-productive activities during: ·         •Time in Transit ·         •Time at the Job Site ·         •Time in the Yard Forty minutes per day, per truck may seem marginal at first glance. But 200 minutes/week x 48 weeks/ year = 9,600 minutes, 160 hours or a total of 4,000 hours of inefficiency for a fleet of 25 trucks. Time in the yard is the lever most within a producer’s control and represents over half of the total nonproductive time per truck. So, rather than simply adding incremental trucks and drivers to the fleet to boost productivity (which unfortunately only adds to the total non‐productive hours and fails to improve operational processes), consider a solution that: ·         •Uses automatic processes via technology to more efficiently track and manage your fleet. ·         •Enables your drivers to punch the clock from in the cab, an efficiency enhancer that alone could save you up to 20 minutes per day (this is time spent in your own yard, under your own watch, that you can act on quickly to recapture those minutes, regardless of what happens away from your yard). ·         •Captures a meaningful portion of that lost time from each driver. ·         •Provides a constant view into the location and performance of your entire fleet. ·        •Is adaptable and helps your teams collaborate in real-time with a “central source of truth” and access to relevant data when you need it. At least 50% of employees’ non‐productive time can be captured back efficiently and effectively when the right combinations of levers are pulled – both in terms of area of focus (i.e., time in yard) and adaptability to each individual customer’s business process requirements. This equates to big productivity increases over both the short- and long-term. Learn more about how Command Alkon’s TrackIt solution offers an industry specific, flexible and fully customizable solution to track your fleet and meet your specific needs, including in-cab time and attendance functionality focused at recapturing lost time in the yard, helping you drive a more efficient fleet and improve your profitability. *500 respondents from the United States and 99 from Australia, New Zealand, United Kingdom and Canada. Of those surveyed, 49% work for general contractor firms, 36% came from specialty trades and 15% were owners. Over 300 respondents came from the commercial sector and the other respondents represent industrial and manufacturing, heavy civil, healthcare, power (oil and gas, and energy), education and government.
Interested in BIG Productivity Gains? Wipe Out Non-Productive Driver and Fleet Time
Command Alkon
There’s some good, solid news for the construction industry: Dodge Data & Analytics Index projects that we’ll have “moderate strengthening” through the end of 2018. But in terms of productivity, we appear to be heading in a different direction. Of note, a recent survey of 600 global construction leaders* compiled by PlanGrid and FMI Corporation mentions: ·         Poor communication, rework and bad data management cost the construction industry; $177 billion annually in labor costs in the United States alone. ·         Construction workers lose almost two full working days per week solving avoidable issues and searching for project information. ·         Each construction project team member spends more than 14 hours weekly on average dealing with conflict, rework and other issues. ·         Almost half of all rework is due to poor communication among project stakeholders, and poor project information, while 26% of rework is due to poor communication or miscommunication between team members caused unresponsiveness of team members; the inability of project stakeholders to collaborate effectively; and the lack of a common platform for all team members to communicate and share project data. ·         The most common goals for technology adoption included providing better access to project data, improving project productivity and increasing the accuracy of project information. ·         Workers are not taking full advantage of mobile devices and IT investments. Stamp Out Non-Productive Driver and Fleet Time for Big Productivity Gains It stands to reason that companies who address productivity issues will not only avoid scrambling for information and wasted hours and energy but also quickly gain competitive advantage. If you’re managing drivers and trucks that wheel in and out of numerous sites during the day or week and aren’t using automatic processes via technology to more efficiently track and manage your fleet, there’s more good news. You can increase driver productivity and avoid the 20-40 minutes per truck per day that’s lost through clocking in and out and other non-productive activities during: ·         Time in Transit ·         Time at the Job Site ·         Time in the Yard Forty minutes per day, per truck may seem marginal at first glance. But 200 minutes/week x 48 weeks/ year = 9,600 minutes, 160 hours or a total of 4,000 hours of inefficiency for a fleet of 25 trucks. Time in the yard is the lever most within a producer’s control and represents over half of the total nonproductive time per truck. So, rather than simply adding incremental trucks and drivers to the fleet to boost productivity (which unfortunately only adds to the total non‐productive hours and fails to improve operational processes), consider a solution that: ·         Uses automatic processes via technology to more efficiently track and manage your fleet. ·         Enables your drivers to punch the clock from in the cab, an efficiency enhancer that alone could save you up to 20 minutes per day (this is time spent in your own yard, under your own watch, that you can act on quickly to recapture those minutes, regardless of what happens away from your yard). ·         Captures a meaningful portion of that lost time from each driver. ·         Provides a constant view into the location and performance of your entire fleet. ·         Is adaptable and helps your teams collaborate in real-time with a “central source of truth” and access to relevant data when you need it. At least 50% of employees’ non‐productive time can be captured back efficiently and effectively when the right combinations of levers are pulled – both in terms of area of focus (i.e., time in yard) and adaptability to each individual customer’s business process requirements. This equates to big productivity increases over both the short- and long-term. Learn more about how Command Alkon’s TrackIt solution offers an industry specific, flexible and fully customizable solution to track your fleet and meet your specific needs, including in-cab time and attendance functionality focused at recapturing lost time in the yard, helping you drive a more efficient fleet and improve your profitability. *500 respondents from the United States and 99 from Australia, New Zealand, United Kingdom and Canada. Of those surveyed, 49% work for general contractor firms, 36% came from specialty trades and 15% were owners. Over 300 respondents came from the commercial sector and the other respondents represent industrial and manufacturing, heavy civil, healthcare, power (oil and gas, and energy), education and government.
Gain a Competitive Advantage by Efficiently Improving the Delivery Experience
Command Alkon
This year has truly blown by. It’s hard to believe that it’s already August – which means it’s practically Christmas, right? I have a very large family, so usually around this time is when I start to budget and plan for Christmas shopping. I have a difficult time in large crowds, so the hustle and bustle of Christmas shopping in the mall isn’t my thing whatsoever. I prefer staying home in my PJ's and shopping around on my favorite app – Amazon.Despite my early jump on the holidays, there are ALWAYS those few friends or family members that I forget about – perfect opportunity for Amazon! While I’m shopping around for a gift, the app gives me an estimate of when my goods will be delivered before I hit “purchase.” Real-time tracking gives me peace of mind to know that everything I ordered will be here before Christmas.Business is all about the customer: what the customer wants and what they get. I’m always a very satisfied customer when I use Amazon, and that’s why I continue to do so. I love constantly receiving information about the goods that I’ve purchased and having confidence that they will be delivered to me when I need them. What if you could also provide your customers with an experience that sets you apart from your competition? What if you too could offer a way for your customers to feel empowered during the order and delivery process?MOBILEjobsite can work for your business in ways that Amazon works for me. Your customer can receive dispatch data in real-time, regardless of their location. Like my Amazon app, this tool is an easy-to-navigate app that gives the user information on orders scheduled for today, upcoming orders for future days, real-time truck locations, load-level summaries of completed and upcoming orders, notifications when a load is on the way to your site, and records of load status times.A consumer survey conducted by Convey, a team of supply chain and technology professionals, showed that the customer forms impressions about the brand throughout the purchase experience, and these impressions are reaffirmed or destroyed by the experience they receive through the delivery process. To succeed, customer loyalty must be a core focus. Gain a competitive advantage by efficiently improving the delivery experience.
Delivery Information Available at the Touch of a Button
Command Alkon
This year has truly blown by. It’s hard to believe that it’s already August – which means it’s practically Christmas, right? I have a very large family, so usually around this time is when I start to budget and plan for Christmas shopping. I have a difficult time in large crowds, so the hustle and bustle of Christmas shopping in the mall isn’t my thing whatsoever. I prefer staying home in my PJs and shopping around on my favorite app – Amazon. Despite my early jump on the holidays, there are ALWAYS those few friends or family members that I forget about – perfect opportunity for Amazon! While I’m shopping around for a gift, the app gives me an estimate of when my goods will be delivered before I hit “purchase.” Real-time tracking gives me peace of mind to know that everything I ordered will be here before Christmas. Business is all about the customer: what the customer wants and what they get. I’m always a very satisfied customer when I use Amazon, and that’s why I continue to do so. I love constantly receiving information about the goods that I’ve purchased and having confidence that they will be delivered to me when I need them. What if you could also provide your customers with an experience that sets you apart from your competition? What if you too could offer a way for your customers to feel empowered during the order and delivery process? MOBILEjobsite can work for your business in ways that Amazon works for me. Your customer can receive dispatch data in real-time, regardless of their location. Like my Amazon app, this tool is an easy-to-navigate app that gives the user information on orders scheduled for today, upcoming orders for future days, real-time truck locations, load-level summaries of completed and upcoming orders, notifications when a load is on the way to your site, and records of load status times. A consumer survey conducted by Convey, a team of supply chain and technology professionals, showed that the customer forms impressions about the brand throughout the purchase experience, and these impressions are reaffirmed or destroyed by the experience they receive through the delivery process. To succeed, customer loyalty must be a core focus. Gain a competitive advantage by efficiently improving the delivery experience.
Eliminate Paper Processes so You Can Focus on What Really Matters
Command Alkon
What's All the Buzz About Electronic Tickets?Paper tickets - this has been a trending topic across the Heavy Building Materials industry for quite some time. Why? Because paper processes are entirely outdated and inefficient, and in an industry that is on-the-go, they can be a hassle to keep track of. Using paper discourages quick billing and quick driver turn around. With the use of mobile technology, drivers can now deliver electronic tickets as soon as materials are delivered. This means quicker invoicing to suppliers and enhanced partnerships. Let's Break It down for You - How Can MOBILEticket Improve Your Business?·        MOBILEticket provides paperless tickets that can’t be lost, rained on, or thrown away. The ticket is an electronic document that is distributable via email without scanning.·        MOBILEticket’s native integration with MCM’s Apex system provides seamless data routing from dispatch to the drivers.·        The intuitive workflow within MOBILEticket makes it easy to learn for new employees.·        Using tablets in their trucks, MOBILEticket can be set up and implemented quickly.Midwest Concrete Materials Sees the Advantages of Implementing MOBILEticketBeing a Command Alkon customer for years, Midwest Concrete rolled out MOBILEticket to the aggregate side of their business. The implementation and training process was straightforward as MCM was already using a number of Command Alkon products. The results of this tool were almost immediate - radio traffic decreased, driver time in the yard decreased and MCM’s internal staff were able to invoice quicker.Placing Focus on What MattersMCM’s drivers appreciate not having to contact dispatch for questions on their tickets. With the paperless tickets they no longer have to manually fill out paper tickets and they get their next ticket displayed on their tablet as soon as they submit the existing ticket. Having all the ticket information on their tablets reduces the amount of questions they have to ask dispatch and there is no risk of the ticket being lost on the jobsite. The reduction in radio traffic increases driver efficiency and allows dispatch to focus on coordinating schedules and getting orders into the system.A+ Customer Experiences and Strengthened Partnerships·The MCM internal staff has seen increased speed at which they can invoice their tickets. The MOBILEtickets are downloaded directly to their financial software and after importing, the tickets are immediately billed. This has reduced time to invoice and eliminated double data entry.Mike Sanson, IT Manager at Midwest Concrete stated, “Our trucks are more efficient, in that they have their assignments immediately upon completion of the previous order. Our drivers have the order information available at their fingertips. The drivers no longer have to fill out paper tickets, and therefore we do not have to double enter to get them into our billing system, eliminating time and mistakes. Our customers receive an email of their ticket immediately in the office alerting them that the material has been delivered, and not waiting on a worker on the job to deliver the paper ticket. Overall, this has streamlined the whole process, and MOBILEticket is a win-win for both our company and our customers.”Want to start a conversation about MOBILEticket? Click here to contact us!
Top 3 Issues That a Top-Notch Mobile Sales Solution Will Address
Command Alkon
Spend More Time in the Field Generating Business Mobile technology that allows real-time information to be collected and shared is changing the face of the construction industry. This technology is being used to track daily activities and critical information, and streamline collaboration between teams in the field and at the office. What's shaking up sales processes in the technology world? Mobile sales solutions. Many sales people love their current manual or isolated quoting processes because they’re easy and have very few constraints. However, the rest of the organization often suffers from the headaches resulting from the lack of visibility or audit trails inherent to these processes, which ultimately negatively impacts your organization’s operational stability and growth plans. If this sounds like your organization, it may be time to investigate automated solutions that are designed specifically for the Heavy Building Materials industry that can empower accurate sales forecasting and minimize quoting inaccuracies. What Can A Mobile Sales Solution Do for My Business? Three problems that a mobile sales solutions address includes: 1) Generating timely and accurate quotes: Roughly 25% of Heavy Building Materials production volume is quoted and shipped within 24 hours. Without real-time information, there is room for unintended errors to easily creep into the process; such as outdated pricing and unauthorized discounts. According to well-regarded research firms, these rebills can cost companies up to 5% of the original transaction value. Progressive Ready-Mix Producers and Bulk Material Suppliers are using mobile sales solutions to more effectively perform quoting, monitoring, and forecasting through an investment that can easily pay for itself by eliminating just a handful of credit and rebill situations. 2) Maintaining realistic pipeline estimates and forecasts: Recent research by the Aberdeen Group shows that only around 55% of companies that do not implement a best-in-class forecasting process achieve their sales quotas, compared to 97% of companies that choose to implement advanced forecasting approaches achieving theirs. With a sales solution in place that provides real-time visibility into both an accurate backlog and an accurate sales forecast, you are empowered to make decisions and adjustments that steer your organization in the right direction on a daily basis (even a hourly basis, if needed) instead of relying on a monthly snapshot of quickly outdated information.  3) Missing opportunities due to lack of visibility in the field: How often does your company miss opportunities simply because a bid date is missed?  Does each sales team member have their own approach to selling, quoting, and closing opportunities?  Is pricing consistency a problem you deal with? With a mobile sales solution designed specifically for the industry in place you can gain the visibility you need to monitor and enforce sales activities and ensure a consistent and professional buying experience to your market. MOBILEsales is Command Alkon’s mobile sales solution for the Heavy Building Materials industry. This tool helps you standardize your sales approach across your team and eliminate issues that arise from inaccuracies and inefficiencies.
Mining, Process Plant, Maintenance & Safety Training
PERFORMANCE ASSOCIATES INTERNATIONAL
Excellence in Mining, Process Plant, Maintenance, and Safety Training  Performance Associates International, Inc. (PAI) is the world leader in online and on-site training for the mining industry. We provide organizations with a single source for assessments, skills training, continuing education, safety training and compliance mandates, and more. Our first-class content guides your staff to gain the critical knowledge they need to work safely and efficiently today.  Our proven, leading-edge industrial training programs improve performance in existing operations and ensure success during the start-up of new operations. Our training programs have saved companies millions in personnel accident prevention, production loss, and equipment damage. We partner with our customers and consult collaboratively to provide the analysis and content development to meet your needs.  Services PAI Offers  Plant Operator Training Our three-tier concept for effective plant operator training starts with fundamental knowledge and progresses to plant-specific concepts that are reinforced through detailed animations and interactive simulations.  Maintenance Training We custom build state-of-the-art maintenance training programs using exploded graphics, explanatory text, detailed procedures, and management systems.  Mobile Equipment Operator Training Our first-class training program focuses on operator controls and indicators, safety, and performance optimization. It also includes operating, emergency, and troubleshooting procedures. Commissioning and Start-Up We can identify, track, and control the thousands of activities that must occur for the successful commissioning and start-up of a process plant. There is no shortcut to a successful start-up. Testing and Tracking Systems We can help manage and track the performance of employees to improve the overall performance of the mine and plant industrial training programs. Our testing and tracking systems provide invaluable assistance in safety and operational compliance.  Introductory and Safety Training Off-the-shelf introductory and safety training packages are an excellent source for mine and plant industrial training courses. They provide fundamental knowledge and basic training concepts. Now offering online courses! E-Learning, Animations, and Simulations Our interactive e-learning keeps trainees focused and engaged. Our experienced in-house multimedia team develops state-of-the-art graphics, virtual and mixed reality training, stunning 3D animations, and technically engineered simulations of real-world scenarios. Other Services We also provide many services relevant to planning, analyzing, and evaluating process plants, including: ·         Operations readiness plan. ·         Planning studies. ·         Quality management. ·         Systems implementation. ·         Statistical process control. ·         Reliability-based asset management. ·         Productive capacity studies. ·         Surveys and needs analyses. ·         Economic life analysis. ·         Process control strategies and methods. ·         Debottlenecking and process optimization. ·         Spare parts inventory and analysis. ·         Feasibility studies. ·         Consulting assistance. Consulting * Gap Analysis * Content Development * LMS * On-Site * Train-the-Trainer * E-Learning * Process Plant Optimization * Training * Safety * Mine Training * Plant Operator Training * Maintenance * Mobile Equipment * Competencies * Commissioning  
Training Pays: Actual vs. Projected Start-Up Results
PERFORMANCE ASSOCIATES INTERNATIONAL
Developing a profitable mining venture is no small matter. It requires enormous initial investments in research, construction, and equipment. But a mineral processing plant does not run itself. Even with the best equipment and good ore quality, optimal results are dependent upon keeping the process running smoothly, avoiding process upsets, maintaining process variables in the desired range, and minimizing breakdowns and downtime. A highly trained workforce is an essential element in a successful, and profitable, start-up. The knowledge and abilities of plant operators and maintenance personnel can make or break an operation. Trained operators know what to look for during preoperational and routine inspections, allowing maintenance tasks to be planned and unexpected costly breakdowns avoided. Trained operators know what variables exist at different stages in the process and how to make appropriate adjustments in real time. Trained maintenance personnel are well acquainted with the plant equipment, and maintenance planners can schedule work and maintain a spare parts inventory to minimize downtime. Additionally, new operations that train their workforce just prior to plant commissioning can utilize their operators in the commissioning process. Having been trained and gained field experience through plant commissioning, operators are ready to hit the ground running once feed is introduced. A faster ramp-up means more earnings, more quickly. The cost of developing a proper training program is a small percentage of the overall engineering, procurement, and construction budget but it constitutes a large percentage of the gains realized from a successful start-up and ramp-up to full production. Performance Associates International (PAI) has designed and presented custom training programs for operators and maintenance personnel in metallurgical plants around the world for over 35 years. We are proud to have been part of the successful start-ups at Lundin Mining’s Eagle Mine, Vale’s Voisey’s Bay project, and Torex Gold’s El Limon-Guajes project. Click Download to view the actual vs. projected start-up results from these three metallurgical plants that made use of PAI’s custom-built training programs and on-site training.
PROCESS CONTROL TRAINING— SIMULATORS ARE ONLY HALF THE STORY
PERFORMANCE ASSOCIATES INTERNATIONAL
With reference to greenfield plant projects, using process simulators similar to the designed plant Human-Machine Interface (HMI) or Distributed Control System (DCS) has become common practice. These simulators represent a “virtual plant” based on process modeling of the circuit chemistry and thermodynamics, and on the physical nature of the plant, including equipment, valves, piping, etc. The virtual plant allows trainees to troubleshoot problems, optimize process variables, react to alarms, etc., all based on the process simulation model. Performance Associates’ experience is that this complex simulator training is valuable, but only after more in-depth training on the process and control logic. To truly optimize a process plant, prior to simulator training, the control room operators must have detailed knowledge of the following:  Process objective of each process system, comprising a group of unit operations.  Process objective of each unit operation.  Process chemistry and the variables affecting it.  Important characteristics of each unit operation, the variables affecting it, and the impact on downstream unit operations.  Plant control loops, interlocks, and alarms.  Safety issues related to the process and control schemes.  Operating procedures for start-up and shutdown under various scenarios, as well as important operator tasks. Additionally, trainees must be intimately familiar with the applicable fundamental scientific concepts, such as pressure, temperature, heat exchangers, electricity, PID control logic, combustion, etc. With this fundamental and plant-specific foundation, the process simulator can be fully exploited for training.
Process Control Training—Simulators Are Only Half the Story
PERFORMANCE ASSOCIATES INTERNATIONAL
With reference to greenfield plant projects, using process simulators similar to the designed plant Human-Machine Interface (HMI) or Distributed Control System (DCS) has become common practice. These simulators represent a “virtual plant” based on process modeling of the circuit chemistry and thermodynamics, and on the physical nature of the plant, including equipment, valves, piping, etc. The virtual plant allows trainees to troubleshoot problems, optimize process variables, react to alarms, etc., all based on the process simulation model.  Performance Associates’ experience is that this complex simulator training is valuable, but only after more in-depth training on the process and control logic. To truly optimize a process plant, prior to simulator training, the control room operators must have detailed knowledge of the following:Process objective of each process system, comprising a group of unit operations.Process objective of each unit operation.Process chemistry and the variables affecting it.Important characteristics of each unit operation, the variables affecting it, and the impact on downstream unit operations.Plant control loops, interlocks, and alarms.Safety issues related to the process and control schemes.Operating procedures for start-up and shutdown under various scenarios, as well as important operator tasks.Additionally, trainees must be intimately familiar with the applicable fundamental scientific concepts, such as pressure, temperature, heat exchangers, electricity, PID control logic, combustion, etc. With this fundamental and plant-specific foundation, the process simulator can be fully exploited for training.